- Specifications
- Connection
- Lighting graphics
- Part number
- Accessories
- Downloads
- Older Version
Specifications
General specifications
| External dimensions | 242x39x31mm |
| Recommended working distance | >50mm |
| LEDs number | 8 |
| Available types | iBlueDrive Continuous |
| Available lighting colors | 365nm 400nm 470nm 525nm 630nm 850nm W00 |
| Angle of incidence of the illumination | |
| ... | ... |
See complete general specifications
Specifications by type
| Type (+) | Power supply | Connector | Power cable | External driver (+) |
|---|---|---|---|---|
| Continuous (C) | 24VDC ±8% | 3P aerial. Length: 150mm | VCC Series (not included) | No |
| iBluedrive (i) | 24VDC ±8%24VDC ±8% | 3P aerial. Length: 150mm | VCC Series (not included) | No |
Maximum instantaneous consumption* (mA)
| Type (+) | Color (+) | ||||||
|---|---|---|---|---|---|---|---|
| 365nm | 400nm | 470nm | 525nm | 630nm | 850nm | W00 | |
| Continuous (C) | 450 | 417 | 479 | 417 | 492 | 396 | 417 |
| iBluedrive (i) | 2020 | 2020 | 2020 | 2020 | 2020 | 1020 | 2020 |
NOTES
* Refer to operating specifications of each type of lamp. (+ info)
This device is also available in 455nm (indigo), 730nm (cherry) and 940nm (infrared+) wavelengths on request.
To obtain this product in multiespectral version and/or in other wavelengths please check availability by emailing us or via the contact form.
Main Dimensions
Connection
Light intensity (Model: PLC0824D-630C )
Brightness distribution
PLC0824D-630C@100mm
Part number
The part number is composed by the model, the color, the type of lamp and the modifier.
Modifiers are only available in some models and they are optional except in case of the emission angles.
In the case where the angle cannot be specified, it will be considered "medium angle".
This device is also available in 455nm (indigo), 730nm (cherry) and 940nm (infrared+) wavelengths on request.
To obtain this product in multiespectral version and/or in other wavelengths please check availability by emailing us or via the contact form.
Model
PLC0824D
/Zz
/67 = IP Rating = IP67
/P = Control input PNP
*Consult modifiers code to add it to the part number. (+ info)
Some combinations of the options shown above may not be supported as standard. Use the reference generator to generate a valid reference. For any other combination, please check availability at info@dcmsistemes.com .
Downloads
Videos
Contact
DCM Sistemes
Pol. Ind. 'El Oliveral', C/ X esquina con C/ G. 46190 - Ribarroja del Turia. Valencia (España)
Tel.:(+34) 96 166 65 27 | Fax: (+34) 96 166 65 24
info@dcmsistemes.com | www.dcmsistemes.com
Link: https://www.dcmsistemes.com/en/products/xxx/plc0824d/







